Every load that requires two or three workers to move manually is costing more than facilities typically account for. Here is how to run the numbers and how to make the case for equipment when the conversation moves to budget.
The labor argument for electric material handling equipment is straightforward once you put actual numbers to it. Most facilities haven’t done that math explicitly because manual load movement is absorbed into normal headcount. It doesn’t show up as its own line item. But the cost is real, it recurs every day, and it compares favorably against the price of the equipment that would replace it.
What a multi-person manual move actually costs
Manufacturing employers paid approximately $46 to $48 per hour in total fully-loaded compensation per worker in 2025, according to Bureau of Labor Statistics data. That figure covers wages, benefits, and employer-side payroll costs: the actual cost of an hour of labor.
A load move that takes three workers 15 minutes uses 45 combined worker-minutes, or 0.75 fully-loaded labor-hours. At $47/hour, that’s roughly $35 in labor cost per move. None of it produces output. It is labor cost spent entirely on moving something from one place to another.
Now scale it. A facility doing 10 manual multi-person moves per day, five days a week, 50 weeks a year runs 2,500 of those moves annually. At $35 per move, that’s $87,500 in annual labor cost spent on load movement alone. That figure doesn’t include injury costs, equipment downtime, or the productive work those workers aren’t doing during those moves.
How the equipment math works
A PowerPusher replaces the group. One operator handles the move; the other two workers return to their primary tasks. The labor freed up from those 2,500 annual moves totals approximately 1,250 hours, counting the two workers no longer needed per move. Those hours go back to productive work.
At $47/hour fully loaded, 1,250 labor-hours recovered equals roughly $59,000 in labor redirected from unproductive movement to actual output annually. That figure doesn’t include reduced injury costs, lower workers’ comp exposure, or the output gains from a less fatigued workforce at the end of each shift.
PowerPusher machines are built to last decades in industrial use. One documented customer outcome: 30 years of daily use with only battery and chain replacements. Amortized over even ten years, the equipment cost per year is typically a fraction of the annual labor savings it produces.
How to frame this for a finance or procurement conversation

Cable Drum Pusher At Prysmian Wrexham
Budget conversations about equipment tend to stall on the purchase price. The way to move them forward is to reframe the question: the facility is already spending money on manual load movement. Switching to electric equipment redirects that spending from labor doing unproductive movement to capital that enables labor to do productive work.
Three numbers make this case: the fully-loaded hourly labor cost, the number of workers involved in manual load moves, and the frequency of those moves per year. Multiply them together to get annual spend on unproductive labor time. Compare that to equipment cost. The payback period usually lands within two years, often faster when injury cost avoidance is included.
The National Safety Council puts the average cost per medically consulted workplace injury at $48,000 in 2024. A single overexertion injury from manual pushing or pulling, the most common and costly injury category in U.S. facilities, can exceed the cost of the equipment that would have prevented it.
What the numbers don’t capture
The labor math is the starting point for the procurement conversation, not the whole argument. Facilities that mechanize manual load movement also see reduced worker fatigue across the shift, which affects quality and error rates in ways that don’t show up in a simple labor cost calculation. They gain flexibility: one operator can move loads without scheduling a team, so loads move when the task requires it rather than when three people happen to be available.
And the equipment is an asset. The labor cost it replaces recurs every year; the equipment purchase is a one-time capital expense that continues producing savings as long as it runs.
Want to run the numbers for your facility? → Build a quote
Want to see what the numbers look like for your operation? → Request a demo
FAQ
Q: How do I calculate the fully-loaded cost of labor for this analysis?
Take base hourly wages and add benefits: health insurance, retirement contributions, payroll taxes, workers’ comp premiums, and paid leave. BLS data puts benefits at roughly 30 percent of total compensation for private industry workers. A $33/hour wage worker costs approximately $47/hour fully loaded.
Q: Does this math work for lower-frequency operations?
It depends on move frequency and equipment cost. For operations with five or fewer multi-person moves per day, the payback period extends, but injury cost avoidance and labor flexibility may still justify the investment. The PowerPusher team can help assess the specific case.
Q: What if we can’t immediately redeploy the freed labor to productive tasks?
That’s a legitimate consideration. In facilities where headcount is already lean, the benefit shows up as reduced overtime, faster task completion, or the ability to absorb more work without adding staff. The freed labor-hours don’t have to be immediately obvious on a productivity report to have value.
Q: Is equipment cost capitalized or expensed?
PowerPusher equipment typically qualifies as a capital expenditure, depreciable over its useful life. Consult your finance team on the specific treatment, which may also qualify for Section 179 expensing in the year of purchase under current U.S. tax rules.
Manufacturing unit labor costs increased an average of 6.1 percent across industries in 2024, according to the Bureau of Labor Statistics. That makes every unproductive labor-minute more expensive than it was the year before.
Q: How do I calculate how much manual load movement is actually costing us?
Count the number of manual moves per day that require more than one person, multiply by average move time and number of workers involved, then multiply by your hourly labor rate. That gives you the weekly labor cost that’s being spent on unproductive movement. Most facilities are surprised by the number.
Q: Will replacing manual movement actually free workers up, or just eliminate tasks?
It frees them up. When one operator with a PowerPusher handles a load that previously took three workers, those two workers return to their primary tasks. Output increases because productive time increases.
Q: What if our facility has tight spaces that make equipment use difficult?
PowerPusher machines are designed for tight spaces. Compact dimensions, variable speed, and full maneuverability are core to the product design. If your facility has specific clearance constraints, the PowerPusher team can recommend the right model.
Q: How quickly do productivity gains show up after switching to electric pushers?
Most facilities see the change quickly, often within the first week. The labor time that was going toward manual moves gets redirected to productive work immediately.
Sources
- BLS, Average Hourly Earnings: Manufacturing, April 2026 — https://fred.stlouisfed.org/series/CES3000000003
- ScaleArmy, Fully Loaded Cost of an Employee — https://scalearmy.com/blog/calculate-fully-loaded-cost-of-an-employee/
- National Safety Council, Work Injury Costs 2024 — https://injuryfacts.nsc.org/work/costs/work-injury-costs/
- Liberty Mutual 2025 Workplace Safety Index — https://business.libertymutual.com/workplace-safety-index/